What You Get
- 10,000-iteration schedule-risk run
- Histogram, S-curve and percentile markers
- Traceable model context behind the result
Run the schedule-risk model and inspect the live Monte Carlo output: histogram, S-curve, P50, P80, convergence and model assumptions.
The engine turns real register and schedule data into simulation output buyers can inspect — in both schedule and cost terms: P50, P80, convergence, drivers and the assumptions behind the answer.
The same engine, the same model — run in cost terms. Duration uncertainty and discrete risks roll up into a QCRA total-cost S-curve with its own P50 / P80.
Start your Demo and run your first Monte Carlo analysis on your own schedule, or talk to sales and we will take you through it on a sample project. No card needed.
Talk to Sales