Engine / simulation

Simulation

Run the schedule-risk model and inspect the live Monte Carlo output: histogram, S-curve, P50, P80, convergence and model assumptions.

Engine / simulation

One click from register to defensible P80.

The engine turns real register and schedule data into simulation output buyers can inspect: P50, P80, convergence, drivers and the assumptions behind the answer.

QRA Model · schedule-risk simulation
Schedule risk · Offshore Platform — delivery schedule0 / 10,000 iterations
DETP50P8025 Dec 2718 Mar 289 Jun 28
sampling…
engine / method prooflive
01Latin Hypercube Sampling with rank correlations
02Three-point duration uncertainty per task or group
03Beta-PERT, Triangular, Trigen, Uniform and Normal distributions
04Discrete risk events with probabilistic schedule and cost impact
05Risk calendars for weather, downtime and blackout windows
06Deterministic CPM on every iteration
07Pre and post mitigation modelling
08Seeded, reproducible runs for auditability
01 / Page focus

What this page covers

  • 10,000-iteration schedule-risk run
  • Histogram, S-curve and percentile markers
  • Traceable model context behind the result
02 / Conversion path

From proof to demo.

Each page keeps a focused CTA, so a buyer can move from the exact feature they care about into a free demo or walkthrough without returning to the top of the homepage.

Book a walkthrough