Engine / calendars

Probabilistic calendar risks

Weather, downtime and blackout windows modelled as probabilistic calendar effects inside the schedule run.

Engine / calendars

One click from register to defensible P80.

The engine turns real register and schedule data into simulation output buyers can inspect: P50, P80, convergence, drivers and the assumptions behind the answer.

01Schedule risk · finish date0 / 10,000 it
P50 2 Sep 27P80 2 Sep 27sampling…
engine / method prooflive
01Latin Hypercube Sampling with rank correlations
02Three-point duration uncertainty per task or group
03Beta-PERT, Triangular, Trigen, Uniform and Normal distributions
04Discrete risk events with probabilistic schedule and cost impact
05Risk calendars for weather, downtime and blackout windows
06Deterministic CPM on every iteration
07Pre and post mitigation modelling
08Seeded, reproducible runs for auditability
01 / Page focus

What this page covers

  • Weather and downtime windows
  • Calendar-driven risk exposure
  • Direct impact on schedule logic
02 / Conversion path

From proof to demo.

Each page keeps a focused CTA, so a buyer can move from the exact feature they care about into a free demo or walkthrough without returning to the top of the homepage.

Book a walkthrough