Engine / mappings

Mappings

Link each risk to the activities and cost elements it actually drives — the step that turns a register into a quantitative model.

Engine / mappings

A risk only matters where it lands.

Mapping is where a register becomes a model: point each risk at the activities and cost elements it actually drives, and the engine knows what to move. Walk the WBS, search by name, tick the links — undo anything.

IdDescription
OP-100Offshore Platform v4.05.02 — UNDER REVIEW
2Key Milestones/Governance Milestones
2Governance Milestones
CP.3.01
CP.7.01
CP.5.01
CP.4.01
CP.6.01
1Other
CP.3.02
CP.3.03
CP.3.04
3Key Standard Milestones
KSM - 1.01
KSM - 1.02
KSM - 1.03
KSM - 1.04
KSM - 1.05
KSM - 1.06
KSM - 1.07
KSM - 1.08
KSM - 1.09
KSM - 1.10
KSM - 1.11
KSM - 1.12
KSM - 1.13
KSM - 1.14
KSM - 1.15
4Engineering & Procurement
ENG-120
ENG-140
PRC-330
PRC-360
3Fabrication
FAB-180
FAB-210
FAB-260
3Offshore Installation
INST-380
INST-400
INST-440
33 activities · 39 mappings33 shown
Uncertainty mapping

Uncertainty across a whole branch, in one pass.

Discrete risks are only half the model — every activity also carries duration uncertainty. Group the schedule by WBS level, give each branch a percentage band, and apply it to hundreds of activities at once instead of typing ranges one by one.

Convert Activity Uncertainty

Group activities by WBS and assign duration uncertainty

1 branch at this level
Groups
%%%
WBS assignment (level 1 branches)
WBS CodeNameTasksGroup
OP-100Offshore Platform v4.05.02 — UNDER REVIEW282
1 group · 282 activities assigned
Probabilistic linking & branching

Some paths only exist some of the time.

Not every relationship is certain. Give a predecessor link or a successor branch its own probability and the engine draws it per iteration — so the logic itself varies, the critical path can move between runs, and conditional scope stops being modelled as though it always happens.

INST-400Hook-up & commissioningactivity panel
Predecessors
IdDescriptionTypeProb.
FAB-260Load-out & sea fastening
CP.4.01CP4 — Technical Solution Design Phase
INST-380Transport & float-over
Successors
IdDescriptionTypeProb.
A9999QSRA Finish Milestone
CP.5.01CP5 — Procurement Phase
INST-440Ready for start-up (RFSU)

Tick a box to give each relationship its own probability — the link is then drawn per iteration instead of always existing.

mappings / what it driveslive
01Map a risk to one activity or to many
02Schedule and cost mappings in one grid
03Duration uncertainty applied across the WBS
04Milestone, group and activity-level targets
05Search and filter large schedules by name
06Undo and redo every mapping change
07Collapse the tree to work one branch at a time
08Mappings drive what the simulation can move
01 / Page focus

What this page covers

  • Map risks to activities or cost elements
  • WBS tree with search and bulk expand
  • Undo/redo on every mapping change
02 / Conversion path

From proof to demo.

Each page keeps a focused CTA, so a buyer can move from the exact feature they care about into a free demo or walkthrough without returning to the top of the homepage.