Link each risk to the activities and cost elements it actually drives — the step that turns a register into a quantitative model.

Engine / Mappings

A Risk Only Matters Where It Lands.

Mapping is where a register becomes a model: point each risk at the activities and cost elements it actually drives, and the engine knows what to move. Walk the WBS, search by name, tick the links — undo anything.

IdDescription
OP-100Offshore Platform v4.05.02 — UNDER REVIEW
2Key Milestones/Governance Milestones
2Governance Milestones
CP.3.01
CP.7.01
CP.5.01
CP.4.01
CP.6.01
1Other
CP.3.02
CP.3.03
CP.3.04
3Key Standard Milestones
KSM - 1.01
KSM - 1.02
KSM - 1.03
KSM - 1.04
KSM - 1.05
KSM - 1.06
KSM - 1.07
KSM - 1.08
KSM - 1.09
KSM - 1.10
KSM - 1.11
KSM - 1.12
KSM - 1.13
KSM - 1.14
KSM - 1.15
4Engineering & Procurement
ENG-120
ENG-140
PRC-330
PRC-360
3Fabrication
FAB-180
FAB-210
FAB-260
3Offshore Installation
INST-380
INST-400
INST-440
33 activities · 39 mappings33 shown
Uncertainty Mapping

Uncertainty Across a Whole Branch, in One Pass.

Discrete risks are only half the model — every activity also carries duration uncertainty. Group the schedule by WBS level, give each branch a percentage band, and apply it to hundreds of activities at once instead of typing ranges one by one.

Convert Activity Uncertainty

Group activities by WBS and assign duration uncertainty

1 branch at this level
Groups
%%%
WBS assignment (level 1 branches)
WBS CodeNameTasksGroup
OP-100Offshore Platform v4.05.02 — UNDER REVIEW282
1 group · 282 activities assigned
Probabilistic Linking and Branching

Some Paths Only Exist Some of the Time.

Not every relationship is certain. Give a predecessor link or a successor branch its own probability and the engine draws it per iteration — so the logic itself varies, the critical path can move between runs, and conditional scope stops being modelled as though it always happens.

INST-400Hook-up & commissioningactivity panel
Predecessors
IdDescriptionTypeProb.
FAB-260Load-out & sea fastening—
CP.4.01CP4 — Technical Solution Design Phase—
INST-380Transport & float-over—
Successors
IdDescriptionTypeProb.
A9999QSRA Finish Milestone—
CP.5.01CP5 — Procurement Phase—
INST-440Ready for start-up (RFSU)—

Tick a box to give each relationship its own probability — the link is then drawn per iteration instead of always existing.

mappings / what it driveslive
01Map a risk to one activity or to many
02Schedule and cost mappings in one grid
03Duration uncertainty applied across the WBS
04Milestone, group and activity-level targets
05Search and filter large schedules by name
06Undo and redo every mapping change
07Collapse the tree to work one branch at a time
08Mappings drive what the simulation can move
01 / At a Glance

What You Get

  • Map risks to activities or cost elements
  • WBS tree with search and bulk expand
  • Undo/redo on every mapping change
02 / Next Step

See It on Your Own Project.

Start your Demo and run your first Monte Carlo analysis on your own schedule, or talk to sales and we will take you through it on a sample project. No card needed.