Activity duration uncertainty

Three-point uncertainty on activities and groups, connected directly to the schedule that the simulation runs.

Engine / uncertainty

One click from register to defensible P80.

The engine turns real register and schedule data into simulation output buyers can inspect: P50, P80, convergence, drivers and the assumptions behind the answer.

01Schedule risk · finish date0 / 10,000 it
P50 2 Sep 27P80 2 Sep 27sampling…
engine / method prooflive
01Latin Hypercube Sampling with rank correlations
02Three-point duration uncertainty per task or group
03Beta-PERT, Triangular, Trigen, Uniform and Normal distributions
04Discrete risk events with probabilistic schedule and cost impact
05Risk calendars for weather, downtime and blackout windows
06Deterministic CPM on every iteration
07Pre and post mitigation modelling
08Seeded, reproducible runs for auditability
01 / Page focus

What this page covers

  • Minimum, most-likely and maximum duration ranges
  • Activity and group-level modelling
  • QSRA-ready uncertainty setup