Engine / Uncertainty

Activity Duration Uncertainty

Three-point uncertainty on activities and groups, connected directly to the schedule that the simulation runs.

Engine / Uncertainty

One Click from Register to Defensible P80.

The engine turns real register and schedule data into simulation output buyers can inspect: P50, P80, convergence, drivers and the assumptions behind the answer.

01Schedule risk · finish date0 / 10,000 it
P50 2 Sep 27P80 2 Sep 27sampling…
engine / method prooflive
01Latin Hypercube Sampling with rank correlations
02Three-point duration uncertainty per task or group
03Ten distributions for durations, costs and impacts
04Discrete risk events with probabilistic schedule and cost impact
05Risk calendars for weather, downtime and blackout windows
06Deterministic CPM on every iteration
07Pre and post mitigation modelling
08Set a seed and the same model gives the same result.
01 / At a Glance

What You Get

  • Minimum, most-likely and maximum duration ranges
  • Activity and group-level modelling
  • QSRA-ready uncertainty setup
02 / Next Step

See It on Your Own Project.

Start your Demo and run your first Monte Carlo analysis on your own schedule, or talk to sales and we will take you through it on a sample project. No card needed.

Talk to Sales