Engine / Schedule

Schedule

A browser-based CPM schedule editor built for XER import, WBS navigation and QSRA-ready modelling.

Schedule / QSRA-Ready CPM

A CPM Schedule Editor in the Browser.

Import the programme, inspect WBS logic and work with a risk-adjusted Gantt. The schedule view is not a screenshot - it is the same model used by simulation.

Layout: DEFAULT
Activity IDDescriptionDurationCalendarStart No Earlier ThanFinish No Earlier ThanEarly StartEarly FinishTotal Float
PRJSample Project — Baseline Schedule
PRJ.1Key Milestones
PRJ.2Assumptions & Dependencies
PRJ.3Initiation
PRJ.4Inception
PRJ.5Feasibility
PRJ.6Planning
PRJ.7Design
PRJ.8Management of Change
PRJ.9Stage Gate
PRJ.10Procurement
PRJ.11Construction
PRJ.12Commissioning & Handover
PRJ.13Cost
20252026
AprMayJunJulAugSepOctNovDecJanFebMarAprMayJun
Mon
Select an activity to view details
Data Date: 2026-04-30 17:00Sample Project - Baseline.xer
01 / Warnings

Schedule Warnings

Every open end, negative-float chain, hard constraint and high-float task — grouped by category and severity, each one accept-or-fix and exportable to Excel for your planners. The quick triage pass before a run.

Schedule Warnings40 warnings foundAll Items ▾
CategorySeverityActivity IDActivity NameDescriptionAccept
02 / DCMA-14

DCMA-14 Schedule Health

The 14-point industry standard — logic, leads and lags, float, hard constraints, BEI and CPLI — scored pass/fail, with the dominant pressure surfaced first and an AI review on tap. A defensible health score, not a gut feel.

DCMA-14 SCHEDULE QUALITY ASSESSMENT9/14 Passed45 act · 54 rel · 30 Sept 2025
Score signal
64%
9 passed
5 failed
Pressure is concentrated in logic, float and execution.
ISSUES90
FAILS5
Dominant pressure Failed first
Relationship Types54/54 100%
Negative Float22/45 49%
Logic8/45 18%
High Float4/45 9%
Operational snapshot
OPEN TASKS45
OPEN RELS54
RESOURCING0
HIGH FLOAT4
💬 Ask about the schedule — e.g. which activities have negative float?
01 / At a Glance

What You Get

  • Import Primavera P6 XER into a project. Open P6 XML and MS Project XML in the schedule editor, then save to the project.
  • WBS tree, activity grid and Gantt
  • The same schedule powers simulation
02 / Next Step

See It on Your Own Project.

Start your Demo and run your first Monte Carlo analysis on your own schedule, or talk to sales and we will take you through it on a sample project. No card needed.

Talk to Sales