A browser-based CPM schedule editor built for XER import, WBS navigation and QSRA-ready modelling.

Schedule / QSRA-ready CPM

A P6-class schedule editor, in the browser.

Import the programme, inspect WBS logic and work with a risk-adjusted Gantt. The schedule view is not a screenshot - it is the same model used by simulation.

Layout: DEFAULT
Activity IDDescriptionDurationCalendarStart No Earlier ThanFinish No Earlier ThanEarly StartEarly FinishTotal Float
PRJSample Project — Baseline Schedule
PRJ.1Key Milestones
PRJ.2Assumptions & Dependencies
PRJ.3Initiation
PRJ.4Inception
PRJ.5Feasibility
PRJ.6Planning
PRJ.7Design
PRJ.8Management of Change
PRJ.9Stage Gate
PRJ.10Procurement
PRJ.11Construction
PRJ.12Commissioning & Handover
PRJ.13Cost
20252026
AprMayJunJulAugSepOctNovDecJanFebMarAprMayJun
Mon
Select an activity to view details
Data Date: 2026-04-30 17:00Sample Project - Baseline.xer
01 / Warnings

Schedule Warnings

Every open end, negative-float chain, hard constraint and high-float task — grouped by category and severity, each one accept-or-fix and exportable to XML for your planners. The quick triage pass before a run.

Schedule Warnings40 warnings foundAll Items
CategorySeverityActivity IDActivity NameDescriptionAccept
High Floatlow A1350Place orderTotal Float: 148d
High Floatlow A1360Lead-inTotal Float: 148d
High Floatlow A1370Delivery to siteTotal Float: 148d
Open Endshigh A6560Procurement strategy & instructionNo predecessors
Negative Floathigh A6560Procurement strategy & instructionTotal Float: -26d
Negative Floathigh A6580Develop pre-tender estimateTotal Float: -26d
Negative Floathigh A6590Pre-tender estimate reviewedTotal Float: -26d
Negative Floathigh A6620RFT issuedTotal Float: -26d
Negative Floathigh A6640RFT returnedTotal Float: -26d
Negative Floathigh A6650Assessment period for clarificationsTotal Float: -26d
Negative Floathigh A6660Finalise quotation assessmentTotal Float: -26d
Open Endshigh A6710Sourcing register sign-offNo predecessors
Open Endshigh A6710Sourcing register sign-offNo successors
High Floatlow A6710Sourcing register sign-offTotal Float: 262d
Open Endshigh A8270Compilation of tender packsNo predecessors
Negative Floathigh A11130Tender periodTotal Float: -26d
Negative Floathigh A6480Contract awardTotal Float: -1d
Negative Floathigh A6720Confirm contract agreementTotal Float: -1d
Negative Floathigh A6730Issue conformed contract agreementTotal Float: -1d
Negative Floathigh A6740Review & acceptance of agreementTotal Float: -1d
Negative Floathigh A6610Approval to award to contractorTotal Float: -1d
Negative Floathigh A11150Contractor mobilisationTotal Float: -1d
Open Endshigh A8280Issue tender packsNo successors
Negative Floathigh A11160Site establishmentTotal Float: -1d
Negative Floathigh A11170Enabling works startTotal Float: -1d
Negative Floathigh A11180Main works commencementTotal Float: -2d
Negative Floathigh A11190Temporary works designTotal Float: -2d
Negative Floathigh A11200Utilities diversionTotal Float: -2d
Negative Floathigh A11210FoundationsTotal Float: -3d
Negative Floathigh A11220SuperstructureTotal Float: -3d
Negative Floathigh A11230Fit-outTotal Float: -3d
Negative Floathigh A11240Building servicesTotal Float: -3d
Open Endshigh A1300Procurement kick-offNo predecessors
High Floatlow A1400Spares procurementTotal Float: 120d
High Floatlow A1410Manuals & handover docsTotal Float: 120d
High Floatlow A1420Training packageTotal Float: 96d
High Floatlow A1430As-built drawingsTotal Float: 96d
High Floatlow A1440O&M scheduleTotal Float: 80d
Hard Constraintshigh A9000Stage gate reviewConstraint: Finish On (FNLT)
High Durationlow A11220SuperstructureRemaining Duration: 62d
02 / DCMA-14

DCMA-14 Schedule Health

The 14-point industry standard — logic, leads and lags, float, hard constraints, BEI and CPLI — scored pass/fail, with the dominant pressure surfaced first and an AI review on tap. A defensible health score, not a gut feel.

DCMA-14 SCHEDULE QUALITY ASSESSMENT9/14 Passed45 act · 54 rel · 30 Sept 2025
Score signal
64%
9 passed
5 failed
Pressure is concentrated in logic, float and execution.
ISSUES90
FAILS5
Dominant pressure Failed first
Relationship Types54/54 100%
Negative Float22/45 49%
Logic8/45 18%
High Float4/45 9%
Operational snapshot
OPEN TASKS45
OPEN RELS54
RESOURCING0
HIGH FLOAT4
💬 Ask about the schedule — e.g. which activities have negative float?
1FAILLogic8/45
Open tasks missing predecessor or successorThreshold: ≤ 5% 17.8%
2PASSLeads0/54
Relationships with negative lag (leads)Threshold: 0% 0.0%
3PASSLags1/54
Relationships with positive lagThreshold: ≤ 5% 1.9%
4FAILRelationship Types54/54
Non Finish-to-Start relationshipsThreshold: ≤ 10% 100.0%
5PASSHard Constraints0/45
Open tasks with mandatory constraints (MSO/MFO/SNLT/FNLT)Threshold: ≤ 5% 0.0%
6FAILHigh Float4/45
Open tasks with total float > 44 working daysThreshold: ≤ 5% 8.9%
7FAILNegative Float22/45
Open tasks with negative total floatThreshold: 0% 48.9%
8PASSHigh Duration1/27
Open tasks with remaining duration > 44 working daysThreshold: ≤ 5% 3.7%
9PASSInvalid Dates0/45
Open tasks with invalid actual / forecast datesThreshold: 0% 0.0%
10N/AResources0/0
Open tasks without a resource assignmentThreshold:
11PASSMissed Tasks0/45
Tasks that should have started or finishedThreshold: ≤ 5% 0.0%
12PASSCritical Path TestPass
Broken critical-path check (600d test)Threshold: Pass
13PASSCPLI1.00
Critical Path Length IndexThreshold: ≥ 0.95 1.00
14FAILBEI0.82
Baseline Execution IndexThreshold: ≥ 0.95 0.82
01 / Page focus

What this page covers

  • XER, MSPDI and MPP import path
  • WBS tree, activity grid and Gantt
  • The same schedule powers simulation