Import the programme, inspect WBS logic and work with a risk-adjusted Gantt. The schedule view is not a screenshot - it is the same model used by simulation.
Layout: DEFAULT
Activity IDDescriptionDurationCalendarStart No Earlier ThanFinish No Earlier ThanEarly StartEarly FinishTotal Float
PRJSample Project — Baseline Schedule
PRJ.1Key Milestones
PRJ.2Assumptions & Dependencies
PRJ.3Initiation
PRJ.4Inception
PRJ.5Feasibility
PRJ.6Planning
PRJ.7Design
PRJ.8Management of Change
PRJ.9Stage Gate
PRJ.10Procurement
PRJ.11Construction
PRJ.12Commissioning & Handover
PRJ.13Cost
20252026
AprMayJunJulAugSepOctNovDecJanFebMarAprMayJun
Mon
Select an activity to view details
Data Date: 2026-04-30 17:00Sample Project - Baseline.xer
01 / Warnings
Schedule Warnings
Every open end, negative-float chain, hard constraint and high-float task — grouped by category and severity, each one accept-or-fix and exportable to XML for your planners. The quick triage pass before a run.
Open Endshigh⌄ A1300Procurement kick-offNo predecessors
High Floatlow⌄ A1400Spares procurementTotal Float: 120d
High Floatlow⌄ A1410Manuals & handover docsTotal Float: 120d
High Floatlow⌄ A1420Training packageTotal Float: 96d
High Floatlow⌄ A1430As-built drawingsTotal Float: 96d
High Floatlow⌄ A1440O&M scheduleTotal Float: 80d
Hard Constraintshigh⌄ A9000Stage gate reviewConstraint: Finish On (FNLT)
High Durationlow⌄ A11220SuperstructureRemaining Duration: 62d
02 / DCMA-14
DCMA-14 Schedule Health
The 14-point industry standard — logic, leads and lags, float, hard constraints, BEI and CPLI — scored pass/fail, with the dominant pressure surfaced first and an AI review on tap. A defensible health score, not a gut feel.