Monte Carlo Simulation

Run the project’s schedule, risks and costs through a Monte Carlo simulation on our servers, and read the P80 for the finish date and the cost.

How It Works

  1. Check the Model

    Model Check beside Run lists gaps in the schedule, risks and costs, such as a risk mapped to nothing, an open end or an activity outside every uncertainty band.

  2. Set the Run

    Pick iterations, a seed, Latin Hypercube sampling, correlations, resource levelling and whether risks run pre- or post-mitigation.

  3. Run

    The run happens on our servers. A large run goes to a background worker: the base result arrives first and the sensitivity follows.

  4. Read the Result

    Schedule Results and Cost Results show the P-values for the project or for any activity, milestone or cost element.

  5. Keep It

    Each run is kept in History under its name and notes, private or visible to the folder.

Details

What You Get

  • Monte Carlo runs entirely on our servers.
  • A full CPM pass in every iteration, with all four link types and P6 constraint types.
  • Set a seed and the same model gives the same result.
  • Optional Latin Hypercube sampling.
  • Optional resource levelling in every iteration.
  • Optional convergence check that ends the run once the results settle.
  • Method based on AACE RP 57R-09.

Limits and Conditions

  • Running a simulation needs an analyst seat.
  • Up to 50,000 iterations per run.
  • A run without a seed cannot be repeated exactly.
  • Model Check is advice. Only a cost formula error stops a run.
  • On the Demo, each project keeps its last 3 runs.