Results

Read a run as histograms and S-curves, a dashboard, a critical path map and a risk radar, and export each view to PDF and Excel.

How It Works

  1. Distribution

    Histogram and S-curve of finish date, duration or cost for the project or anything in the tree, at any percentile.

  2. Contingency

    See the gap from the deterministic date or cost to the chosen P-value.

  3. Paths

    The Critical Path Map shows the critical and float paths the run produced.

  4. Radar

    Risk Radar sorts activities into Critical, High, Medium and Low bands and flags modelling defects. The weights and thresholds are settings.

  5. Export

    Export each desktop view to PDF or Excel.

Details

What You Get

  • Each run stores P5, P10, P20, P50, P80, P90 and P95, the mean, standard deviation, skew and kurtosis.
  • A convergence view for the run.
  • Views: Dashboard, Schedule Results, Cost Results, Comparison, Sensitivity, Drivers, Critical Path Map, Risk Radar, Joint Confidence and Cash Flow.

Limits and Conditions

  • No PowerPoint export of QRA results.
  • Views on a phone do not export.

Try RiskForesight for 14 Days.

No card needed.